<aside>
💡 The Production Engineering team merged with ProbeLab on 23rd January 2023. This page and those under it are to be considered historical and will eventually be archived.
</aside>
(Also available as a Google Present doc)
Short Timeline
- Dec '21 - At NetOps summit, Ian proposes that NetOps focusses on production engineering
- Feb '22 - Sid proposes new Production Engineering team, recruits Ian to lead
- Start Apr '22 - Ian transitions to Production Engineering team
- Early Apr '22 - Ian breaks arm, low availability for 7-8 weeks
- Late Apr '22 - Team orients around improving gateway TTFB
- May '22 - Focus on increasing data locality in gateway by improving garbage collection
- Jun '22 - Tom Hall joins team, transitioning from Bifrost
Q2 2022 Achievements